Unit 1, Wolverhampton

Delivery of a 201,265 sq. ft. industrial and logistics unit in Wolverhampton, one mile from Junction 2 of the M54 and three and a half miles north of Wolverhampton city centre.

IndustrialLogisticsM54 corridorPrincipal ContractorLive site
Steel frame of Unit 1 under construction in Wolverhampton
Client
Confidential
Location
Wolverhampton, West Midlands
Project value
201,265 sq. ft.
Our role
Project Manager & Principal Contractor
Sector
Industrial / Logistics
Status
On site — 2026

Project overview

The site sits in a prime industrial and logistics location within one mile of Junction 2 of the M54 motorway and three and a half miles north of Wolverhampton city centre. The surrounding area is established with major engineering, aerospace and distribution occupiers, giving the scheme strong transport links and access to a skilled local labour force.

Unit 1 is a 201,265 sq. ft. industrial and logistics building designed to meet modern occupier requirements. The specification includes 15 m eaves height to the haunch, 50 kN/m² floor loading, 15% roof lights for natural daylight and LED lighting throughout, supported by a 1 MVA power supply to the site.

Access and circulation are configured for large-scale logistics operations, with 18 dock levellers, 7 drive-in doors and yard depths of up to 50 m within a secure, fenced site. The development also provides extensive car parking, onsite EV chargers and high quality office and welfare accommodation.

Norvek is acting as Project Manager and Principal Contractor, coordinating the design, procurement and construction phases to deliver the building to the agreed programme, cost and quality standards. Works are currently on site and progressing through the structural frame, cladding and external works packages.

Gallery

Steel frame of Unit 1 under construction in Wolverhampton
The steel frame taking shape on site.
Excavator working alongside the steel frame in Wolverhampton
Steel frame erection and enabling works in progress.
Site-wide view of the development with materials and plant
Site-wide view showing groundworks and material storage.
Heavy plant and site operations in Wolverhampton
Earthworks and site infrastructure under construction.
Large yellow articulated dump truck on site
Site logistics and bulk earthmoving operations.
Vibro-compaction rig and excavator working on site
Ground improvement and piling operations in progress.