Octagon Theatre, Bolton

A major part-new-build, part-refurbishment redevelopment that retained and upgraded the theatre's distinctive main auditorium while creating new performance, rehearsal and public spaces.

New buildRefurbishmentArts and cultureTown-centre site
Completed Octagon Theatre exterior and main entrance in Bolton
Client
Octagon Theatre / Bolton Council
Location
Bolton, Greater Manchester
Project value
£12m redevelopment
Our role
Project delivery
Sector
Arts and Culture
Status
Completed 2020

Project overview

The redevelopment of the Octagon Theatre in Bolton combined substantial new construction with the careful refurbishment of the original 1967 building. The scheme retained the theatre's distinctive main auditorium at its heart while replacing and extending other parts of the venue to meet modern performance, audience and operational requirements.

Partial demolition created space for a new five-storey extension containing a studio theatre, rehearsal facilities and improved backstage accommodation. The retained areas were refurbished alongside the new structure, bringing together old and new within a live town-centre setting.

Front-of-house improvements introduced a new café, a larger bar and a multipurpose event space. Dressing rooms, offices and administration areas were upgraded, while new mechanical services and rooftop plant improved heating, cooling and ventilation across the venue.

The completed building provides better access and circulation throughout, a flexible 393-seat auditorium and additional spaces that support a broader programme of performances, rehearsals and community activity.

Gallery

Completed Octagon Theatre exterior and main entrance in Bolton
The completed Octagon Theatre following its redevelopment.
Scaffolded exterior of the Octagon Theatre during redevelopment
External construction and refurbishment works in progress.
Construction team working beside the theatre's red external wall
New-build works progressing alongside the retained structure.
Temporary access and structural works inside the theatre
Complex internal access during the redevelopment.
Interior room under construction with materials prepared for installation
Internal fit-out and partition works under way.
Mechanical services installation within a refurbished theatre space
Mechanical services and internal finishes being coordinated.
New ventilation ductwork installed above a theatre corridor
New ventilation infrastructure within the retained building.
Rooftop plant and ductwork installation at the theatre
Rooftop mechanical plant and distribution works.
New rooftop extension and mechanical services during construction
The new extension and rooftop services taking shape.
Construction hoist serving the theatre redevelopment
Managed vertical access within the constrained site.